01. POWER CLASSIFICATION 

Grid connection requirements for energy storage systems up to 50 kW 


02. FIRE SAFETY

Fire protection requirements


03. ENERGY STORAGE TECHNOLOGIES 

Technological solutions for energy storage systems 


ENERGY STORAGE POWER CLASSIFICATION

MICROINSTALLATIONS UP TO 50 kW

Submitting an update notification to the distribution network operator is sufficient. There is no need to modify the grid connection conditions if the exported power remains unchanged.

INSTALLATIONS ABOVE 50 kW

An application for grid connection conditions is mandatory. The connection procedure requires detailed technical documentation and system schematics.

LARGE ENERGY STORAGE SYSTEMS

An application for grid connection conditions is mandatory. The connection procedure requires detailed technical documentation and system schematics.

ENERGY STORAGE SYSTEMS UP TO 50 kW

Grid connection requirements for energy storage systems up to 50 kW


ENERGY STORAGE SYSTEMS ABOVE 10 MW 

Grid connection requirements for energy storage systems above 10 MW


FIRE SAFETY OF ENERGY STORAGE SYSTEMS

LITHIUM-ION BATTERIES

The risk of thermal runaway requires installation outside
underground rooms with direct external access.

INVERTERS WITH AFCI

An active AFCI function in the inverter ensures maximum
protection against electrical hazards and fire risks.

LEAD-ACID BATTERIES 

A traditional but proven technology that requires proper
ventilation and isolation from heat sources.

LITHIUM-ION ENERGY STORAGE SYSTEMS 

High energy density storage technology 


LEAD-ACID ENERGY STORAGE SYSTEMS

Cost-effective and proven energy storage technology

See our selected renewable energy projects

01
PV FARM 1.88 MW
UNIN-KOLONIA

A photovoltaic farm with a capacity of 1.88 MW was built in Unin-Kolonia, Garwolin County.

02
FARMA PV 3 MW
WŁOSZCZOWA / WOLA WIŚNIOWA

A 3 MW photovoltaic farm was developed on an area of 3.5 hectares in Włoszczowa (Wola Wiśniowa).

03
PV FARM 1 MW
KŁODA

A 1 MW photovoltaic farm was constructed in Kłoda, Głogów County.

04
PV FARM 1,5 MW
PARGOWO

A photovoltaic farm with a capacity of 1.5 MW was completed in Pargowo, Police County.

05
PV FARM 1,8 MW
LEŻACHÓW

In Leżachów, Przeworsk County, a 1.8 MW photovoltaic farm was developed.

06
PV FARM 1 MW
PODBORZE

In Podborze, Mielec County, a photovoltaic farm with a capacity of nearly 1 MW was implemented.

07
PV FARM 1 MW
MŚCISZEWICE

In Mściszewice, Kartuzy County, a PV farm with a capacity of nearly 1 MW was completed. 

08
PV FARM 725 kW
POLFARMEX (KUTNO)

A 725 kW PV installation was built in Kutno for Polfarmex. 

09
FARMA PV 1 MW
SOKOŁOWO

A 1 MW photovoltaic farm was built in Sokołowo, Golub-Dobrzyń County.

10
FARMA PV 1 MW
KRZESZÓW

A 1 MW photovoltaic farm was built in Krzeszów Górny, Nisko County.

Partners supporting our renewable energy implementations

×

Write to us

and schedule a meeting

Zapytaj o produkt

ELECTRICOM S.A.
KRS: 0001052199
NIP: 6772495513
REGON: 525556946

    *Required field