Comprehensive solar farm delivery. Design, construction and management.

SOLAR FARM DEVELOPMENT STAGES. CLEARING UP THE DOUBTS.

Design, component specification, electrical schematics and regulatory compliance. We begin with the documentation required for the project. Grid connection conditions, permits and legal title – these are your entry point. Once these are secured, we begin the solar farm design process.

01 ENGINEERING DESIGN AND DOCUMENTATION

Design, component specification, electrical schematics and regulatory compliance. We begin with the documentation required for the project. Grid connection conditions, permits and legal title – these are your entry point. Once these are secured, we begin the solar farm design process.

02 PROCUREMENT PROCUREMENT AND LOGISTICS

Comprehensive supply of equipment: photovoltaic modules, inverters, and mounting structures. We provide full logistics support and optimization of procurement costs.

03 CONSTRUCTION IMPLEMENTATION AND COMMISSIONING OF THE SOLAR FARM

Construction of solar farms, installation of mounting systems, cabling, and connection of transformer stations. We complete the process with final measurements and submission for acceptance by the grid operator.

SAFETY IN SOLAR FARM PROJECT DELIVERY

SINGLE POINT OF RESPONSIBILITY

Instead of working with multiple subcontractors, you have one partner responsible for the entire project.

CONTRACTUAL PENALTIES FOR DELAYS

The contract includes clear conditions: if the project is delayed due to the contractor, the EPC contractor bears the financial consequences.

WORKMANSHIP WARRANTY

A minimum two-year warranty for all works and components. Any defects are repaired at no additional cost.

POST-COMMISSIONING SERVICE

After the solar farm is commissioned, we provide O&M services – monitoring, inspections, cleaning and repairs – all in one place.

THE PROCESS OF DEVELOPING YOUR OWN RENEWABLE ENERGY SOLAR FARM

FIVE STEPS:

FROM DOCUMENTATION

TO FULL OPERATION

1

We begin with the documents you already have. Grid connection conditions, permits and legal title – these are your entry point.

2

STEP TWO READY TO BUILD

You provide us with the required documentation. Ready-to-build status means the project is prepared to move into the construction phase.

3

STEP THREE ENGINEERING

We prepare full project documentation, select system components and develop the technical designs.

4

STEP FOUR PROCUREMENT

We order the panels, inverters and mounting structures. All components are delivered to the construction site according to the planned schedule.

5

STEP FIVE CONSTRUCTION

We build, install and connect the system to the grid. The solar farm begins operation under our supervision.

CLIENT PROTECTION

An EPC contract is your guarantee. Electricom S.A. is responsible for every stage of the project. If the project is delayed, we pay contractual penalties. If any defects occur, we repair them for two years at no additional cost. After construction is completed, we provide O&M services – monitoring, inspections, panel cleaning and all necessary repairs.

Konrad Klimek

CEO Electricom S. A.

Contact our team and explore the possibilities 

See our selected renewable energy projects

01
PV FARM 1.88 MW
UNIN-KOLONIA

A photovoltaic farm with a capacity of 1.88 MW was built in Unin-Kolonia, Garwolin County.

02
FARMA PV 3 MW
WŁOSZCZOWA / WOLA WIŚNIOWA

A 3 MW photovoltaic farm was developed on an area of 3.5 hectares in Włoszczowa (Wola Wiśniowa).

03
PV FARM 1 MW
KŁODA

A 1 MW photovoltaic farm was constructed in Kłoda, Głogów County.

04
PV FARM 1,5 MW
PARGOWO

A photovoltaic farm with a capacity of 1.5 MW was completed in Pargowo, Police County.

05
PV FARM 1,8 MW
LEŻACHÓW

In Leżachów, Przeworsk County, a 1.8 MW photovoltaic farm was developed.

06
PV FARM 1 MW
PODBORZE

In Podborze, Mielec County, a photovoltaic farm with a capacity of nearly 1 MW was implemented.

07
PV FARM 1 MW
MŚCISZEWICE

In Mściszewice, Kartuzy County, a PV farm with a capacity of nearly 1 MW was completed. 

08
PV FARM 725 kW
POLFARMEX (KUTNO)

A 725 kW PV installation was built in Kutno for Polfarmex. 

09
FARMA PV 1 MW
SOKOŁOWO

A 1 MW photovoltaic farm was built in Sokołowo, Golub-Dobrzyń County.

10
FARMA PV 1 MW
KRZESZÓW

A 1 MW photovoltaic farm was built in Krzeszów Górny, Nisko County.

Partners supporting our renewable energy implementations

×

Write to us

and schedule a meeting

Zapytaj o produkt

ELECTRICOM S.A.
KRS: 0001052199
NIP: 6772495513
REGON: 525556946

    *Required field